Close

News

Final stage of KTM Tokamak physical start-up

On November 20, 2019 plasma discharge was obtained that met requirements of the second and final stage of KTM facility physical start-up. At the current stage operability of KTM facility was demonstrated as well as its main technological systems with plasma obtain in ohmic mode (without supplement heating device). During experiments, the initial phase of […]

Read More

Second Scientific Workshop

The employees of the IAE Branch RSE NNC RK took part in work of the Second Scientific Workshop between the specialists of the National Nuclear Center RK, Toshiba Energy Systems & Solutions Corp. and Marubeni Utility Services, which was held between 11 and 14 November 2018 in Tokyo (Japan). In the course of this Workshop […]

Read More

Final stage of work on packaging and transportation of fresh highly enriched uranium-graphite fuel of the IGR reactor

The final stage of packaging and transportation of fresh highly enriched uranium-graphite fuel of the IGR reactor was successfully completed. The fuel was delivered to the Ulba Metallurgical Plant for further enrichment reducing. The work was carried out as part of the Russian Research Reactor Fuel Return Program (RRRFR) implementation of the US Department of […]

Read More

Training Course on Nuclear Plant Safety

Between 30 September and 25 October 2019, a Training Course on Nuclear Plant Safety was held in Tsuruga, Japan. Japan Atomic Energy Agency was the initiator of the training.   Within the framework of the course, a wide range of topics on nuclear energy was presented related to safety control and structural peculiarities for ensuring safety […]

Read More

Contest to fill vacant positions

On the 8th of November 2019, Institute of Atomic Energy Branch of the Republican State Enterprise on the basis of economic control rights “National Nuclear Center RK” of the RK Ministry of Energy advertises a contest to fill vacant positions:   Head of the Department for Out-of-Pile Tests (Dep. 240) Skill requirements:  Higher education, experience […]

Read More

Completion of Test Program of Two Experimental WCTCs-LEU

As part of international initiatives on the non-proliferation of nuclear weapons in the Republic of Kazakhstan, conversion of research reactors to low-enriched fuel is being carried out. In order to implement the conversion of the IVG.1M reactor, the FSUE SRI SPA “LUCH” (Russia) manufactured experimental water-cooled technological channels with low-enriched fuel (WCTC-LEU). On 29 October […]

Read More

REACTOR TECHNOLOGY TRAINING COURSES

In the period from 24 to 25 October 2019, in the Institute of Atomic Energy Branch RSE NNC RK the Follow-up Training Course “Reactor Engineering” was held within the framework of an Agreement between Al-Farabi Kazakh National University, National Nuclear Center of the Republic of Kazakhstan and Japanese Atomic Energy Agency (JAEA) for training personnel […]

Read More

Technical Meeting with specialists from Idaho national Laboratory (INL) and Oak-Ridge National Laboratory (ORNL)

From 23 to 26 October 2019, regular technical meeting of specialists from Idaho National Laboratory (INL) and Ok-Ridge National Laboratory (ORNL), USA, was held. During the technical meeting, issues for preparation of CRR “Baikal-1” infrastructure for repatriation of irradiated IVG.1M reactor HEU fuel to Russia was discussed as well as dawn-blending technology of IGR irradiated […]

Read More