18.10.2018
The main News The experiments are ongoing
  • Строительство Токамака
  • Установка КТМ
  • Установка КТМ
  • Установка КТМ
  • Установка КТМ
  • Установка КТМ
  • Установка КТМ
  • Установка КТМ
  • Установка КТМ
  • Установка Eagle
  • Установка КТМ
  • Установка КТМ
  • Работы на Токамаке
  • Строительство Токамака
  • Оборудование
  • Боксы
  • Разгрузка оборудования
  • Электрогенераторы
  • Строительство КТМ
  • Площадка
  • КТМ
  • Электрогенератор
  • Строительство КТМ
  • Пультовая управления реактором
  • Реактор ИВГ.1М
  • Пультовая реактора ИВГ.1М
  • Кран
  • Площадка
  • Кран
  • Установка
  • Сборка изделия
The main menu
Transportation Control Center
Web-resources
Banner
Statistics of visiting
We have 17 guests online
The experiments are ongoing PDF Print E-mail
Monday, 15 February 2016 16:35

The beginning of the year for the National Nuclear Center of RK was marked by visit of Japanese colleagues from Toshiba, Marubeni Utility Services, Nippon Nuclear Fuel Development CO., LTD. A group of representatives from Japanese organizations has arrived within the Fukushima Debris project implementation jointly with NNC RK.

Following a number of technical meetings on December 28, 2015, within the Fukushima Debris project the experiment FDP-3 was conducted at the “LAVA-B” experimental facility. During the experiment the melting of materials was received in electric melting furnace of the facility, simulating by its composition the melting of Fukushima 1 NPP reactor core materials formed after the accident. The melting received was drained into molten metal trap filled with water. Solidified fragments of the melting formed as a result of the experiment will be studied to determine its physical-mechanical properties and microstructure.

During the work within the period in January 10-15, Japanese delegation was accompanied by group of journalists from Japanese broadcasting corporation NHK which is a one of the world’s largest TV companies. Following the video recording carried out, the film of cooperation between Japanese companies and NNC RK within the Fukushima Debris project will be produced.

 
Polls
How do you estimate the new design of our site?